infoiess@ug.edu.gh

+233 (0) 302 962 720

Box LG 209, Legon, Accra

2009 IESS - Air Quality Assessment of a Thermal Power Producing Area in Ghana: A Case Study of the Air Emissions of Takoradi Thermal Power Station and Its Effects on the People of Aboadze

×

Error message

Deprecated function: preg_match(): Passing null to parameter #2 ($subject) of type string is deprecated in rename_admin_paths_url_outbound_alter() (line 83 of /home/ugedu/public_html/sites/all/modules/rename_admin_paths/rename_admin_paths.module).

Air quality assessment was done in a thermal power producing area in Ghana called Aboadze from the period of October 2008 to March 2009. This coastal village of Aboadze is located 15km east of Takoradi, the capital town of the Western region of Ghana. This research determined the levels of the oxides of nitrogen (NOx), sulphur dioxide (SO2), particulate matter (PM10) and noise in the ambient environment.

Year of Publication: